2.7 KiB
curl release procedure - how to do a release
in the source code repo
-
edit
RELEASE-NOTES
to be accurate -
update
docs/THANKS
-
make sure all relevant changes are committed on the master branch
-
tag the git repo in this style:
git tag -a curl-7_34_0
. -a annotates the tag and we use underscores instead of dots in the version number. Make sure the tag is GPG signed (using -s). -
run "./maketgz 7.34.0" to build the release tarballs. It is important that you run this on a machine with the correct set of autotools etc installed as this is what then will be shipped and used by most users on *nix like systems.
-
push the git commits and the new tag
-
gpg sign the 4 tarballs as maketgz suggests
-
upload the 8 resulting files to the primary download directory
in the curl-www repo
-
edit
Makefile
(version number and date), -
edit
_newslog.html
(announce the new release) and -
edit
_changes.html
(insert changes+bugfixes from RELEASE-NOTES) -
commit all local changes
-
tag the repo with the same name as used for the source repo.
-
make sure all relevant changes are committed and pushed on the master branch
(the web site then updates its contents automatically)
on github
- edit the newly made release tag so that it is listed as the latest release
inform
- send an email to curl-users, curl-announce and curl-library. Insert the RELEASE-NOTES into the mail.
celebrate
- suitable beverage intake is encouraged for the festivities
curl release scheduling
Basics
We do releases every 8 weeks on Wednesdays. If critical problems arise, we can insert releases outside of the schedule or we can move the release date - but this is very rare.
Each 8 week release cycle is split in two 4-week periods.
-
During the first 4 weeks after a release, we allow new features and changes to curl and libcurl. If we accept any such changes, we bump the minor number used for the next release.
-
During the second 4-week period we do not merge any features or changes, we then only focus on fixing bugs and polishing things to make a solid coming release.
Coming dates
Based on the description above, here are some planned release dates (at the time of this writing):
- May 22, 2019
- July 17, 2019
- September 11, 2019
- November 6, 2019
- January 8, 2020 (moved)
- February 27, 2020
- April 22, 2020
- June 17, 2020
The above (and more) curl-related dates are published in iCalendar format as well.