ns_hera update (changelog per Merkaba)

- Redesigned MS -> Cargo route to remove the marine-sized door bottleneck.

- Added a weldable underneath the lift between MS-Cargo - welding brings the lift up and seals off that entrance.

- Put in hint brushes in MS in an attempt (read: attempt!) to bring r-speeds down. It's better in general now, but still goes over 700 in spots.

- Hopefully fixed the stuck-problems in ventilation. All the tunnels now have smooth surfaces allowing for easier skulk movement too.

- Tweaked Ventilation Hive, main change being that skulks/lerks/gorges can walk across the area under the hive without having to jump over the...er...struts, or whatever they are.

- Added a hole in the weldable grate in northern corridor, allowing skulks/lerks/jetpackers/fades through, and gorges + marines from one side only.

- Extended vent from Archiving Hive to Northern Corridor so it has another exit above the RT in same corridor.

- Added horizontal supports stretching across Archiving to aid skulks in moving about (particuarly from one side to the other)

- Fixed the most minor of graphical artifacts in Reception (this was my fault and nothing to do with the wires texture or anything else)

- Fixed HOM in Northern Corridor (Like I need to say that...)

- Added a ladder in Holoroom leading up onto the balcony to cargo.

- Retextured ventilation to an extent.

- Modified RT room in Processing in a minor way, meaning the RT is no longer blocked from view until you run around the centre computer console.

- More minor changes.

git-svn-id: https://unknownworlds.svn.cloudforge.com/ns1@163 67975925-1194-0748-b3d5-c16f83f1a3a1
This commit is contained in:
Zunni 2005-06-03 13:24:47 +00:00
parent d1a3fbf168
commit 7a0ab2d03e
2 changed files with 0 additions and 0 deletions

Binary file not shown.

Binary file not shown.